top of page

IN THE NEWS

The Media Is Taking Notice

Write a short summary of this news item and provide a link to the original story online. This is also a great place to provide resources for your customers to read more about your industry, service trends and more.

Soldering circuit board

CHINA BUILDS NEW RESEARCH CENTER

Write a short summary of this news item and provide a link to the original story online. This is also a great place to provide resources for your customers to read more about your industry, service trends and more.

Circuit Board

NEW EFFICIENCY IN OIL & GAS

Write a short summary of this news item and provide a link to the original story online. This is also a great place to provide resources for your customers to read more about your industry, service trends and more.

Engineering Tools

LUSAIL ICONIC STADIUM, QATAR

2017 - 2018
Company: Aurecon Australasia

This flagship stadium will host the opening and closing matches of the Qatar 2022 World Cup. The stadium comprises an insitu concrete frame lower bowl and an insitu concrete/steel framed upper bowl. Precast elements were created for the rakers, bleachers and vomitories.

​

James, while working for Aurecon Australasia, led the modelling team of over 30 people across 4 countries and 7 time zones, delivering a BIM level 2 structural model that could be used to fabricate all construction materials and could also be used to build with on site

​

Architect: Foster + Partners

ELEKTRON TOWERS, LONDON, UK

2008
Company: Whitby Bird and Partners

This high rise residential development in the heart of London’s docklands comprised of 3 towers, one at 25, the other two at 22 storeys which were supported on a joint podium deck over piled raft foundations. Graham lead a multidisciplinary team for this high rise project, while working for Whitby Bird and Partners. The project had a number of challenging site constraints such as the DLR train line to the south, the main reuters fibre optic to the financial district to the north, and a major electricity power station the east.

​

Architect: Halpern Architects

KINGSPAN KOOLTHERM FACILITY, JÖNKÖPING, SWEDEN

2018 - 2019
Company: Ramboll Sverige AB

This 17500 sq.m industrial facility is to be become the hub in Sweden to support Kingspans distribution of products within Scandanavia. The project was taken from inception to completion.
Graham was acting as design manager and client interface, taking the initial ideas from the client, developing them into a planning application, then developing the design for the tender process. Upon appointment of the main contractor, Graham continued as the client liaison, checking the quality of the design and installations on site until practical completion.

ERICSSON ICT AND DATA CENTRE, ROSERSBERG, SWEDEN

2013
Company: Ã…F

The 20000m2 facility consists of a steel framed structure with minimal internal bracing situated on a piled ground slab. The project was delivered to a very challenging timeframe.

Karl lead the structural design team during the detailed design and construction phases where he maintained a close relationship with the project management team and main contractor to facilitate the timely delivery of the project.


Architect: Scheiwiller Svensson Arkitekter / WingÃ¥rdhs

NORTH EAST QUADRANT, LONDON, UK

2010
Company: Halcrow Yolles

This development comprised of a high rise residential of 163 units and a medium rise office complex of 530 000 sq.ft, all joined by the below ground parking facility. Graham's primary role was to lead the structural team to develop the design up to construction.

There were some challenging constraints to this project such as the Northern Line underground tunnel beneath the site, together with sensitive existing buildings directly adjacent.


Architect: Wilkinson Eyre / Tate Hindle / Stephen Marshall Architects

OUR PEOPLE

James Morris.jpg

JAMES MORRIS

TIStructE TMICE

​

BIM Manager
Principal Technician

Paul Campesato.jpg

PAUL CAMPESATO

GIstructE GIEAust

​

Principal Structural Engineer

Graham Edge.jpg

GRAHAM EDGE

MIStructE

​

Managing Director

KL Close Up.jpg

KARL LAMBERT

MIEI GICE

​

Project Manager
Structural / Civil Engineer

bottom of page